QUOTATION NO.
|
TITLE
|
OPENING DATE
|
CLOSING DATE
|
SIZE |
MADA (BIP)201/12
|
MEMBINA DAN MENYIAPKAN SEBUAH PUSAT MEKANISASI LADANG SERTA KERJA-KERJA BERKAITAN DI PEJABAT KETUA CAWANGAN PERKHIDMATAN MEKANIKAL MADA, JITRA, KEDAH DARUL AMAN.
|
08 OCTOBER 2012 |
05 NOVEMBER 2012 |
579 kb |
S421494-Jadual Kadar
|
TO FABRICATE AND REPLACE GATE AT TIDAL CONTROL STRUCTURE IN MADA |
30 SEPTEMBER 2012 |
17 OCTOBER 2012 |
1 mb |
S421495-JADUAL KADAR
|
MEMBEKAL DAN MENGHANTAR PERALATAN NELAYAN (ENJIN MOTOR SANGKUT) UNTUK PROGRAM AZAM TANI TAHUN 2012
|
01 OKTOBER 2012 |
15 OKTOBER 2012 |
499 kb |
S421496-JADUAL KADAR
|
MEMBEKAL DAN MENGHANTAR PERALATAN NELAYAN (SAMPAN) UNTUK PROGRAM AZAM TANI TAHUN 2012
|
01 OCTOBER 2012 |
15 OCTOBER 2012 |
496 kb |
S421497-JADUAL KADAR
|
MEMBEKAL DAN MENGHANTAR PERALATAN NELAYAN (PUKAR HAYUT) UNTUK PROGRAM AZAM TANI TAHUN 2012
|
01 OCTOBER 2012 |
15 OCTOBER 2012 |
496 kb |
S421493
|
MENJAYAJALANKAN KERJA-KERJA MENGGANTI ‘GATE GUIDE’ YANG LAMA KEPADA JENIS ‘STAINLESS STEEL’. DI PINTU NO. 2 TANDOP KUALA KUAR, WILAYAH II MADA
|
12 SEPTEMBER 2012 |
03 OCTOBER 2012 |
1003 kb |
LKPM4005
/12 |
MENAIKTARAF JALAN LADANG KEPADA TANAH MERAH DAN BATU PECAHAN DI SALA DRAIN 1-L2, KG. GELAM, LOKALITI D-IV, WILAYAH IV, MADA, KEDAH DARUL AMAN
|
6 SEPTEMBER 2012 |
30 SEPTEMBER 2012 |
594 kb |
LKPM4006
/12 |
MENAIKTARAF JALAN LADANG TERSIER KEPADA BATU PECAHAN DI BLOK PENGAIRAN SCRBD 4-T10, KG. 20/30, LOKALITI E-IV, WILAYAH IV, MADA, KEDAH DARUL AMAN |
6 SEPTEMBER 2012 |
30 SEPTEMBER 2012 |
598 kb |
LKPM4002/12
|
MENAIKTARAF BAN KANAN KEPADA BATU PECAHAN DI BLOK PENGAIRAN SCRBD 5, KG. TITI BATU, LOKALITI F-IV, WILAYAH IV, MADA, KEDAH DARUL AMAN
|
5 SEPTEMBER 2012 |
26 SEPTEMBER 2012 |
591 kb |
LKPM4003
/12 |
MENINGGIKAN JALAN LADANG TERSIER DENGAN TANAH MERAH DI BLOK PENGAIRAN CCRBD, 14a-T3 DAN CCRBDr 14a-P1, KG. TOK TONG, LOKALITI A-IV, WILAYAH IV, MADA, KEDAH DARUL AMAN
|
5 SEPTEMBER 2012 |
26 SEPTEMBER 2012 |
608 kb |
LKPM4004
/12 |
MENAIKTARAF BAN KANAN KEPADA TANAH MERAH DAN BATU PECAHAN DI BLOK PENGAIRAN SCRBD 7c, KG. SG. TONGKANG, LOKALITI F-IV, WILAYAH IV, MADA, KEDAH DARUL AMAN |
5 SEPTEMBER 2012 |
26 SEPTEMBER 2012 |
605 kb |
MADA/BPESA 4/2012
|
MENAIKTARAF SISTEM BEKALAN AIR KE KOMPLEKS PERUMAHAN UNIT EMPANGAN MUDA, SIK, KEDAH DARUL AMAN
|
29 AUGUST 2012
|
12 SEPTEMBER 2012 |
557 kb |
MADA/BPTM/CTM/2012-2 |
MENYELENGGARA, MENGHANTAR, MEMASANG DAN MENGUJI PERKAKASAN KOMPUTER BAGI 14 PEJABAT PERTUBUHAN PELADANG KAWASAN (PPK) LEMBAGA KEMAJUAN PERTANIAN MUDA (MADA) |
26 AUGUST 2012 |
09 SEPTEMBER 2012 |
57 kb |
MADA/BPESA 3/2012 |
MENJALANKAN KERJA PEMBERSIHAN SG AHNING DAN SG PADANG TERAP SEPANJANG 28KM BERMULA DARI EMPANGAN AHNING HINGGA KE PERTEMUAN SG PEDU DI KUALA NERANG, DAERAH PADANG TERAP, KEDAH DARUL AMAN |
22 JULY 2012 |
08 AUGUST 2012 |

1 mb |
S421491 |
‘TO FABRICATE, SUPPLY, DELIVER, INSTALL AND COMMISSION A NEW HYDRAULIC CONTROL SYSTEM FOR THE OPERATION OF THE BUTTERFLY VALVES AND TO REFURBISH THE HYDRAULIC PIPE LINES AT THE VALVE CHAMBER AREA IN PEDU DAM, |
09 JULY 2012 |
07 AUGUST 2012 |

1 mb |
LKPM 3005/2012 |
MENYENGGARA BAN KANAN T14 SCRBD 1a3 DAN BAN KIRI SCRBDr 2, LOKALITI F-III, PENDANG, WILAYAH III, MADA. |
03 MAY2012 |
14 MAY 2012 |

630 kb |
LKPM 3004/2012 |
MENYENGGARA BAN KANAN OUTLET CCRBD 9(L), BAN KANAN ALOR TOK RAJA DAN BAN KANAN ALOR BERALA, BLOK 25 CCRBD 9(L), LOKALITI D-III, TITI HAJI IDRIS, WILAYAH III, MADA. |
03 MAY 2012 |
14 MAY 2012 |

623 kb |
LKPM 3003/2012 |
MENYENGGARA BAN KANAN CCRBD 9(L), LOKALITI D-III, TITI HAJI IDRIS, WILAYAH III, MADA. |
02 MAY 2012 |
13 MAY 2012 |

610 kb |
LKPM 3002/2012 |
MENYENGGARA BAN SISIAN LADANG MEMPELAM TOBIAR, BLOK 25 CCRBD 9(L), LOKALITI D-III, TITI HAJI IDRIS, WILAYAH III, MADA. |
02 MAY 2012 |
13 MAY2012 |

680 kb |
LKPM 3001/2012 |
MENYENGGARA BAN KANAN ALOR PENYENGAT, BAN KANAN SUNGAI KANDAI DAN BAN KIRI CCRBD 10c2, LOKALITI C-III, TAJAR, WILAYAH III, MADA. |
02 MAY 2012 |
13 MAY 2012 |

704 kb |
BPTM/CTM/2012-1 |
MENYENGGARA, MENGHANTAR, MEMASANG DAN MENGUJI PERKAKASAN KOMPUTER BAGI 6 PEJABAT PERTUBUHAN PELADANG KAWASAN (PPK) LEMBAGA KEMAJUAN PERTANIAN MUDA (MADA) |
09 APRIL 2012 |
23 APRIL 2012 |

327 kb |
S421489-JADUAL KADAR |
MEMBEKAL DAN MENGHANTAR PERALATAN PERTANIAN UNTUK PROGRAM PROGRAM AZAM TANI TAHUN 2012 |
25 MARCH 2012 |
12 APRIL 2012 |

722 kb |
S421488 |
‘FABRICATE, SUPPLY, DELIVER AND INSTALL GALVANISED MILD STEEL PUMP COLUMNS, PIPE SECTIONS AND OTHER RELATED ITEMS FOR THREE (3) PUMP STATIONS IN WILAYAH 3 MADA. |
11 MARCH 2012 |
28 MARCH 2012 |

741 kb |
S421487-JADUAL KADAR |
MENJAYAJALANKAN KERJA-KERJA MENGGANTI ‘GATE GUIDE’ YANG LAMA KEPADA JENIS ‘STAINLESS STEEL’. |
07 MARCH 2012 |
28 MARCH 2012 |

622 kb |
S421486 – JADUAL KADAR |
MEMBEKAL DAN MENGHANTAR PERALATAN PERTANIAN UNTUK PROGRAM ESTET PADI PROGRAM NKEA TAHUN 2012 |
26 FEBRUARY 2012 |
08 MARCH 2012 |

665 kb |
MADA/ BPESA 1/2012 |
UNDERWATER DIVING, INSPECTION AND INVESTIGATION OF THE GENERAL PHYSICAL CONDITION OF INTAKE STRUCTURE AT PEDU DAM, DAERAH PADANG TERAP, KEDAH DARUL AMAN |
21 FEBRUARY 2012 |
29 FEBRUARY 2012 |

61 kb |
S421485 |
MENJALANKAN KERJA MENGGANTI ‘RUBBER O-RING END CAP HOLLOW JET VALVE NO. 1, EMPANGAN PEDU |
15 FEBRUARY 2012 |
27 FEBRUARY 2012 |

727 kb |
S421484 |
TAWARAN MEMBELI KENDERAAN TERPAKAI MADA BIL. 1/2012 (ASET BOLEH DI LIHAT DARI 30 JANUARI 2012 HINGGA 6 FEBRUARI 2012 |
29 JANUARY 2012 |
12 FEBRUARY 2012 |

522 kb |